Lake Peachtree Dam – Peachtree City, GA
|
Services: Concrete
|
Faith Presbyterian Church
|
Services: Concrete, Proofroll, Soil Evaluation, Soil Density
|
Fayette County High School Auditorium
|
Services: Concrete
|
Jackson High School
|
Footing Inspection, Proofroll, Extraction/Gradation, Soil Compaction.
|
Pine Street Elementary School
|
Services: Concrete, Mansonry, Proofrolls, NPDES, Duck Weldings, Soil Compaction Tests, Steel Inspection
|
West Village Parkway – Henry County
|
FDR Mix Design and Testing
|
Certainteed Expansion
|
Footing Inspection. Soil Compaction Inspection. Concrete Testing.
|
Westbridge Road – SR 92 Fayette County
|
Compaction Inspection. Concrete Testing. Proofroll Inspection.
|
Ken’s Foods – McDonough GA
|
Concrete Services
|
Porsche Headquarters Testing Track
|
Provided Coring, Field Density and Quality Control Services
|
|
|
Bridge Foundation Investigation – Maple Street, Griffin GA
|
Performed auger borings and soil classifications
|
Springs at McDonough
|
Performed Bulk Specific Gravity permeability tests, T-209 tests and Extraction Gradation tests.
|
St. John the Evangelist Catholic School
|
Coring at random locations to determine pavement thickness, Hot Mix Asphalt (HMA) density and performed HMA extractions
|
O’Kelley Street at Oakland Avenue
|
Rock Study in Rockdale County to determine rock depth
|
Peachtree Elementary School
|
Rock Study for Riley Field Ridge Line. Classified soils and determined rock depth
|
Woodland High School Building Addition
|
Provided Boring and Asphalt Coring Services and Soil Classifications for existing parking and drive areas. Submitted preliminary Geotechnical Report
|